Home with solar panels in North Brisbane & Moreton Bay

EV charger installation in Clear Mountain

Charge your car overnight or straight from your solar. A neat, safe home charger installed by electricians who understand solar.

Free quote in Clear Mountain

We reply within 24 hours. No spam, no pushy follow-ups.

Family ownedFounder-led by Lewis
Free on-site measureFixed price, no surprises
Quality componentsFronius, SMA, REC Solar, JA Solar
Commercial track recordAldi, BP, James Hardie, Telstra

EV chargers for Clear Mountain, planned around your home

A standard power point adds only about 10km of range an hour. A dedicated 7kW wall charger is around four times faster, and a solar-aware charger can soak up your surplus solar during the day instead of exporting it for a few cents.

We check your switchboard and main supply, recommend single or three phase charging, and install the charger neatly where your car actually parks. In Clear Mountain we can also pair the charger with new solar or a battery so it all works together.

North Brisbane and Moreton Bay run from Albany Creek and Strathpine through North Lakes and Narangba to Caboolture and Bribie Island, taking in the Redcliffe Peninsula and acreage around Samford and Dayboro. From Clear Mountain to nearby Cashmere and Eatons Hill, we quote every job in person so the price you sign is the price you pay.

  • Plenty of Clear Mountain properties are on acreage, which opens up ground-mounted arrays, sheds and larger systems. Rural feeders also see more outages, so battery backup is popular here.
EV Charger Installation in Clear Mountain

What you get in Clear Mountain

Home EV chargers that can run on your own solar.

7kW and 22kW chargers

Single and three phase chargers from reputable brands, with app control.

EV Charger Installation

Solar charging

Chargers that follow your solar output so you drive on sunshine.

Switchboard check

We confirm your supply can handle the load and upgrade it if needed.

Neat cable runs

Conduit run cleanly to the garage, carport or driveway.

Clear Mountain at a glance

Council
City of Moreton Bay
Electricity network
Energex
Postcode
4500
Population
807 (2021 census)
Area
10.8 square kilometres
State electorate
Pine Rivers
Federal division
Dickson
Typical solar output
27.7kWh a day from 6.6kW
Export limit
5kW per phase, more on dynamic connections
Rebates
Federal STCs and federal battery discount
Distance
About 23km from Brisbane CBD in a straight line
6kW system, North Brisbane
Nearby RS Energy project6kW system, North Brisbane, about 17km from Clear Mountain

Getting to know Clear Mountain

Farming came first, with the creek flats used for corn, vegetables, bananas, pineapples, dairy cows and pigs. Two small schools served the families: Branch Creek ran from 1889 to 1913, and Clear Mountain school opened in 1903 and lasted until 1947. The area was part of Pine Rivers Shire until the 2008 merger into the Moreton Bay Region.

Hillside acreage can catch great sun on north facing slopes, but trees and ridgelines may shade other aspects, so a site visit to look at roof angles and ground mount options is worthwhile.

Local background drawn from public sources including Wikipedia (CC BY-SA 4.0).

What an EV charger costs in Clear Mountain

Typical installed prices in South East Queensland and northern NSW. We confirm a fixed price after checking your switchboard.

7kW charger, installed
$1,000 to $2,300
Switchboard upgrade (if needed)
$800 to $2,200
Trenching to a detached garage
From $400

Recent work

See all projects

EV chargers in Clear Mountain: questions

Still unsure? Talk to us directly. You will speak with the people who do the work.

Call 0449 942 735

How much does it cost to install an EV charger?

A 7kW charger is typically $1,000 to $2,300 installed. If your switchboard needs an upgrade, allow another $800 to $2,200. We give a fixed price after a quick check.

Can I charge my EV from solar?

Yes. A solar-aware charger adjusts its charging speed to match your surplus solar, so you use your own power instead of exporting it. It works best if the car is home during the day.

Do I need three phase power?

No. Most homes are well served by a 7kW single phase charger, which comfortably fills most cars overnight. Three phase allows 11kW to 22kW if your home already has it.

Do you install EV chargers in Clear Mountain units and townhouses?

Often, yes, subject to body corporate approval and the building supply. We can provide the technical details your body corporate will ask for.

Do you service Clear Mountain 4500 and nearby suburbs?

Yes. Clear Mountain is part of our North Brisbane & Moreton Bay service area in the City of Moreton Bay area, and we regularly work in Cashmere, Eatons Hill, Joyner, Samford Valley. Call 0449 942 735 or request a quote online and we will reply within 24 hours.

Your local solar team near Clear Mountain

Open in Google Maps

Ready for a fixed-price quote in Clear Mountain?

Free on-site measure. We reply within 24 hours.

Get your free quote

We reply within 24 hours. No spam, no pushy follow-ups.

Prefer to talk? Call 0449 942 735

Call nowGet a free quote